Control System on the Nipper

The primary forum for discussing all things Nipper. Feel free to ask questions.
PIK21 Super Sytky
Posts: 6
Location: Grenchen, Switzerland
Contact:

Control System on the Nipper

Postby PIK21 Super Sytky » Tue Aug 27, 2013 7:55 am

I am building the PIK 21 which is mid wing. The prototype is "side stick" and i want to build with conventional stick on the floor. I would like info as to how the Nipper Ailerons and the control system in general is operated. If there are drawings or sketches available, the source would be fine. Does any member have any drawings or sketches they could copy me. Costs would be re-imbursed. Many thanks in advance. Roger
It takes 7514 bolts to build a plane and 1 nut to spread it over the landscape

PIK21 Super Sytky
Posts: 6
Location: Grenchen, Switzerland
Contact:

Re: Control System on the Nipper

Postby PIK21 Super Sytky » Tue Sep 17, 2013 9:59 am

Does any member have drawings or detailed photos showing the control column and connection
To the ailerons i could use for my project. any assistance would be greatly appreciated

Roger
It takes 7514 bolts to build a plane and 1 nut to spread it over the landscape

jockthenipper
Posts: 59

Re: Control System on the Nipper

Postby jockthenipper » Wed Sep 18, 2013 12:49 am

Hello,
Have you tried contacting Paul Grellier at Airweld? He may be able to help with Nipper drawings if you explain what you need. The contact details in the UK are:

Tel. 01962 776547
Mob. 07885 933514
Fax. 01962 776036 info@airweld.co.uk
12 New Barn Farm Cottages, Crawley, Winchester, Hampshire SO21 2PP

Good Luck, Peter

PIK21 Super Sytky
Posts: 6
Location: Grenchen, Switzerland
Contact:

Re: Control System on the Nipper

Postby PIK21 Super Sytky » Wed Sep 18, 2013 2:24 pm

Hi Peter, many thanks for the info i will contact him.

Much appreciated.

Roger
It takes 7514 bolts to build a plane and 1 nut to spread it over the landscape


Return to “GENERAL CHAT”

Who is online

Users browsing this forum: No registered users and 2 guests